Machine Relocation – Dismantling, Transport and Recommissioning of Individual Machines

Machine relocation is the coordinated move of a single machine or piece of equipment from one site to another – including dismantling, transport, reassembly and realignment at the destination. NM Solutions delivers the entire process as a single-source service: from the on-site survey and transport-grade packing through to recommissioning and dimensional checks. A typical single-machine relocation takes roughly 2 to 6 weeks depending on complexity and distance, while sensitive CNC or precision machines require additional alignment and geometry verification. The scope includes skilled fitters, lifting and rigging equipment, EU-wide transport logistics, packaging and complete photo and cabling documentation. This minimises downtime and ensures your machine produces with the same accuracy at the new location as before. We work Europe-wide, in multiple languages, and within an agreed shutdown window.

Request a quote

Our process

  1. 1

    On-site survey

    Site visit, technical assessment of the machine and recording of media connections, foundation and access. This produces a binding relocation concept.

  2. 2

    Engineering & planning

    We define the dismantling sequence, lifting and rigging plan and transport concept. Shutdown windows, interfaces and trades are coordinated with your team.

  3. 3

    Dismantling

    Controlled disassembly by qualified fitters, including disconnection of electrical, hydraulic and pneumatic services. Every connection is documented and labelled.

  4. 4

    Packing & labelling

    Transport-grade securing, preservation of sensitive components and clear labelling of all parts. Sensors and electronics are protected separately.

  5. 5

    Transport & logistics

    EU-wide transport with suitable vehicles and heavy-lift or specialist equipment where needed. We coordinate permits, loading and insurance.

  6. 6

    Reassembly & alignment

    Installation at the destination, levelling, alignment and reconnection of all services. Geometry and dimensional accuracy are verified to the manufacturer's specifications.

  7. 7

    Recommissioning

    Function test, trial run and handover to your production. On request we support the production ramp-up and hand over the full documentation.

Industries we serve

  • Automotive & suppliers
  • Metalworking & steel
  • Food & beverage
  • Machinery & plant engineering
  • Building materials
  • Pharma & chemicals

For industrial clients in the calibre of ABB, Bühler and Knauf, we have relocated individual machines between European plants – including dismantling, specialist transport and precise recommissioning with minimised production downtime.

Frequently asked questions

How long does a machine relocation take?+

Relocating a single machine typically takes 2 to 6 weeks depending on size, complexity and distance. The actual on-site shutdown window is usually much shorter and is agreed precisely with you in advance. Precision and CNC machines need extra time for alignment and geometry checks.

Do you operate across Europe?+

Yes. NM Solutions carries out machine relocations Europe-wide, with a focus on the German-speaking market. We coordinate transport permits, logistics and assembly across borders and work in multiple languages alongside your on-site team.

How is the machine insured during transport and installation?+

Relocations are carried out with appropriate insurance cover for transport and handling. We agree the exact scope per project and state it transparently before the project starts, giving your procurement team full certainty.

How do you ensure the machine runs accurately afterwards?+

During reassembly we level and align the machine to the manufacturer's specifications and verify geometry and dimensional accuracy. We only hand over to your production after a successful function test and trial run – complete with a protocol.

What documentation do we receive?+

You receive complete photo and cabling documentation, labelling lists and inspection and acceptance protocols. These records ensure traceability and support audit and compliance requirements.